Lathe axis. - DDCSV2.1 - Standalone CNC Motion Controller - Digital Dream Technology support
View: 5229|Reply: 6
Print Previous Topic Next Topic

Lathe axis.

[Copy Link]

1

Threads

4

Posts

15

Credits

Newbie Member

Rank: 1

Credits
15
Jump to the specified floor
Landlord
Posted at 2018-9-10 21:40:17 | All floors Replies reward |Descending browser |Read mode
Hello guys!

I'm sorry for my bad english.

I have the machine with 4th axis A.
So, at this moment this axis is programming only in absolutly mode. What I mean: if I use a spiral toolpath, axis A accumulates A coordinates and if the spiral has 100 twist - I get the coordinate A36000. It is bad situation.

Is it possible to change something in the controller? I want to use a different algorithm for the A axis. It must zero coordinate A when the angle reaches 360 degrees.

What should I change in the controller for the jump after 360 degree to 0 degree?

What I have now:

A358
A359
A360
A361
A.....

What I need:

A358
A359
A0
A1
A...

Thank you.
Reply

Use props Report

1

Threads

4

Posts

15

Credits

Newbie Member

Rank: 1

Credits
15
Sofa
 Author| Posted at 2018-9-11 20:23:13 | All floors
ytliu Posted at 2018-9-11 06:36
You can insert the G92 command to meet your requirements.
A358
A359

Could you explain what does it mean G92?
In the standart ISO G-code it is the shift working system of coordinate.

Reply Support Opposition

Use props Report

1

Threads

4

Posts

15

Credits

Newbie Member

Rank: 1

Credits
15
Bench
 Author| Posted at 2018-9-11 20:30:44 | All floors
maxx2000 Posted at 2018-9-11 13:59
My friend, it's configurable in your CAM or postprocessor. In the settings you need to specify how y ...

In my life I wrote more then 50 postprocessors for real machines. Basically for 5-coordinate machines.
I know how to make it in the PP.
And I know as minimum 3 variant algoritm for the lathe axis.

But here is a question about the controller.
Reply Support Opposition

Use props Report

1

Threads

4

Posts

15

Credits

Newbie Member

Rank: 1

Credits
15
Floor
 Author| Posted at 2018-9-11 20:32:07 | All floors
In any way thank you for the answers.
Reply Support Opposition

Use props Report

You need to log in before you can reply Login | Register now

This forum Credits Rules

Shenzhen Digital Dream Numerical Technology Co., Ltd. support
Adress:507,A Building,Leibo Industry Zone,No. 22 Jinxiu East Road,Kengzi Street,Pingshan district,Shenzhen City,P.R. of China
Phone:13244704799
E-mail:info@ddcnc.com

TEL

0755-87654321

Wchat

Website designed by DigitalDream Technology Support
Quick Reply Back to top Back to list