Asian Terminals aims to expand capacity - DDCSV2.1 - Standalone CNC Motion Controller - Digital Dream Technology support
View: 811|Reply: 0
Print Previous Topic Next Topic

Asian Terminals aims to expand capacity

[Copy Link]

971

Threads

971

Posts

3181

Credits

Forum veteran

Rank: 8Rank: 8

Credits
3181
Jump to the specified floor
Landlord
Posted at 2023-6-30 09:04:39 | Only Author Replies reward |Descending browser |Read mode
Last edited by taitai In 2023-6-30 09:31 Editor

Port operator Asian Terminals is expanding its capacity at the Manila South Harbour to over one million 20-foot equivalent units (TEUs) to meet increasing container volumes at the Port of Manila.

Asian Terminals Incorporated (ATI) stated that the terminal enhancement programme will expand current facilities, maximising its yards and converting available spaces within the South Harbor expanded port zone to additional container stacking and truck-marshaling areas. ATI will complete the crane rail extension at Pier 3 by the end of 2012 as a lead up to the deployment of additional quayside cranes that will further increase berth capacity at South Harbour.

The port is also taking delivery of two rubber-tyred gantry cranes (RTGs) in early 2013, in addition to other container handling equipment aimed at further boosting the yard’s productivity levels.

Asian Terminals aims to expand capacity

Reply

Use props Report

You need to log in before you can reply Login | Register now

This forum Credits Rules

Shenzhen Digital Dream Numerical Technology Co., Ltd. support
Adress:507,A Building,Leibo Industry Zone,No. 22 Jinxiu East Road,Kengzi Street,Pingshan district,Shenzhen City,P.R. of China
Phone:13244704799
E-mail:info@ddcnc.com

TEL

0755-87654321

Wchat

Website designed by DigitalDream Technology Support
Quick Reply Back to top Back to list